TRANSMISSION LINE AND SUBTATION GANTRIES PROJECTS
PROJECT   NAME
LOCATION
YEAR
VOL
MAIN CONTRACTOR
OWNER/END USER
             
IBRD Power XV Project East Java 1990       156 t PT. Merlin Gerin Ind. PT. PLN
             
Supporting Steel Structure East Java 1991       150 t Siemens GmbH, Germany PT. PLN 
150 kV/500 kV Gresik CCPP            
             
Duri Kosambi & Suralaya West Java 1992       900 t PT. MultiFabrindo PT. PLN
Substation Project            
             
Supporting Steel  Structure East Java 1992         14 t Sprecher Energie Ltd. PT. PLN
150  kV  S/S  Ujung            
             
Supporting Steel Structure Cilegon 1992         20 t Siemens  GmbH, Germany PT. PLN
Kotabaja Extension, 150 kV            
             
Supporting Steel Structure Sumatera 1992         22 t PT. GP Unindo Jaya CALTEX
for Caltex Substation            
             
Belawan CCPP Block II North Sumatera 1993       100 t Siemens GmbH, Germany PLN
(430 MW), Switch-yard            
             
150 kV Transmission Line Java-Bali 1993/1994       231 t Asea Brown Boveri AG. PT. PLN
Java-Bali Stage I            
             
500 kV Transmission Line Java-Bali 1993/1994         81 t Asea Brown Boveri AG. PT. PLN
Cilegon-Cibinong-Saguling            
             
150 kV Transmission Line East Java 1994       981 t Balfour Beatty Sakti Ind PT. PLN
for Big Consumer Project            
             
500 kV Transmission Line West Java 1994       600 t Asea Brown Boveri AG. PT. PLN
Cilegon-Cibinong-Saguling            
             
150 kV Transmission Line West Java 1994       290 t Asea Brown Boveri AG. PT. PLN
Java-Bali, Stage I            
             
150 kV substation East Java 1994       380 t Siemens AG, Germany PT. PLN
Grati/Pasuruan CCPP            
             
  Java 1995       800 t PT. Multifab PT. PLN
             
500 kV Substation  West Java 1995       540 t ABB  Power  Generation PT. PLN
Muara Tawar CCPP            
             
150 kV Substation  West Java 1995         90 t PT. Abdi Bangun Buana PT. PLN
Cikarang Listrindo Phase II            
             
150  kV  Transmission Tower Central Java 1995       400 t PT.  Wijati  Aji PT. PLN
Rawalo  -  Semen Nusantara            
             
PLN Transmission Tower South  Sumatera 1995       270 t PT. Ciptanusa  Castech PT. PLN
70 kV Single & Double Sirkit            
             
150 kV  PLN Transmission Central Java 1996       120 t PT. Wijati Aji PT. PLN
Tower ( Stub )            
             
150 kV  PLN Transmission Lines East  Kalimantan 1996       600 t PT.  Mega Eltra PT. PLN
Tarahan  -  Sutami             
150 kV Transmission Tower Jakarta 1997       800 t PT. Wahanayasa Trans Energi PT. PLN
Karet - Angke            
             
150 kV Switchyard Structure Pekanbaru 1997       500 t Siemens AG PT. PLN
             
150 kV T/L Suppa - Parepare Sulawesi 1997       400 t PT. Citacontract PT. PLN
             
150 kV Gantry for Lahendong  North          
Power  Plant 1 x 20 MW Project Sumatera 1997         50 t Spie Enertrans PT. PLN
             
500 kV Transmission Line Tower East Java 1997   18,600 t BBL - BBSI - Joint Operation PT. PLN
D/C Paiton - Kediri LOT 1   1998        
             
500 kV Transmission Line Tower Central Java 1997   17,900 t BBL - BBSI - Joint Operation PT. PLN
D/C  Kediri - Klaten LOT 2   1998        
             
150  kV Gantry for Substation West Java 1997       150 t PT. Multifab/PT. Meta Epsi Eng. PT. PLN
             
150 kV T/L Sei Denai Sumatera 1997         70 t PT. Wijaya Karya PT. PLN
             
150 kV Substation Duri Kosambi Jakarta 1999         40 t PT. Austrodwipa Energy PT. PLN
             
275 kV  T/L Sumatera Sumatera 1999   14,000 t KEC International Ltd. PT. PLN
    2000        
             
275 kV Transmission Lines Tower Sumatera 1998   14,500 t KEC International Ltd. PT. PLN
for South Sumatera   1999        
             
275 kV Transmission Lines  Queensland Australia 2000 30 t Kilpatrick Green POWERLINK QUEENSLAND
Tower (Stub Tower Supply)            
             
275 kV Transmission Lines  Queensland Australia 2000 44 t Kilpatrick Green POWERLINK QUEENSLAND
Tower (Stub Tower Supply)            
             
500 kV Trans. Lines Tower West Java 2001   18,000 t BBL - BBSI - Joint Operation PT. PLN
D/C  Tasikmalaya - Depok   2002        
             
150 kV T/L RENUN HEPP Sumatera 2001       140 t PT. Wisma Sarana Teknik  PT. PLN
             
500 kV T/L Tower Transmission Java - Bali 2003  580 t  ABB AG - Ajikawa - Joint Operation PT. PLN
Tasikmalaya - Rawalo Bau - Klaten   2004        
             
Steel Structure and Gantries for East Java 2003       800 t SIEMENS AG PT. PLN
500/150 KV S/S, Tasikmalaya   2004        
             
Lot 15: 150 kV/TL South Sulawesi South Sulawesi 2004     4,900 t ABB AG  Power Line Division PT. PLN
Supply, Fabrication, Galvanizing             
Tower Stub            
             
New Tasikmalaya Substation  West Java 2004  3,6  t PT. SIEMENS Indonesia PT. PLN
             
Gantry, Beam & Equiptment  West Java 2005       130 t PT. SIEMENS Indonesia PT. PLN
structure 150 kV Sentul Substation             
             
Maligi & Embalut Substation Indonesia 2005         14 t PT. SIEMENS Indonesia PT PLN
             
150 kV Substation Bulk Project 2005 Lombok 2005       210 t PT. VATECH T&D PT PLN
             
150 kV Gambir Lama Substation  Jakarta 2005         15 t PT. SIEMENS Indonesia PT PLN
    2006        
             
150 kV T/L Jawa Bali Power  Jakarta  2007     2,580 t PT. Balfour Beatty Sakti Indonesia  PT PLN 
Package IFB 3 A             
             
Gantry Tower Cikarang Listrindo  Jakarta  2007 26.5 t PT. SIEMENS Indonesia  PT. Cikarang Listrindo
Project            Power Company 
             
Gantry Tower Cikarang Listrindo  Jakarta 2007 2.1 t PT. SIEMENS Indonesia  PT. Cikarang Listrindo
Project            Power Company 
             
Gantry Tower Cikarang Listrindo  Jakarta  2007 1.7 t PT. SIEMENS Indonesia  PT. Cikarang Listrindo
Project            Power Company 
             
Gantry Tower Tanjung Bunga  Jakarta  2007 9.5 t PT. SIEMENS Indonesia  PT PLN 
Tallasa Project             
             
Paket 27: 150kV Transmission Line, Celukan Bawang Kapal Indonesia 2008 1051 t PT. Balfour Beatty Sakti Indonesia  PT PLN 
             
Project Kalimantan 150 Kv Package 3C  Indonesia 2008 113 t PT. Balfour Beatty Sakti Indonesia  PT PLN 
             
Paket 5A Asahinas Menes Banten 2008 674 t PT. Balfour Beatty Sakti Indonesia  PT PLN 
             
Transmission Line 275 kV OHTL Medan - Galang Binjai ( Project Execution in 2008 ~ 2009 )  Indonesia 2008 849 t PT. Balfour Beatty Sakti Indonesia  PT PLN 
             
TOWER MENARA Indonesia 2008 5.3 t PT. Berca Indonesia PT PLN 
             
Tower 150 Kv T/L PLTU 1 Jawa Barat-Kosambi Baru-Sukamandi West Java  2008 700 t PT. Dalima Putra Perdana  PT PLN 
Gardu Induk Muka Kuning Transmisi 4 CCT 150 KV Batam 2008 97.2 t PT. Dalima Putra Perdana  PT PLN
             
Transmissi 4 CCT 150Kv Muka Kuning  Batam 2008 203.9 t PT. Dalima Putra Perdana  PT PLN
             
Gardu Induk Batakan & Tengkawang  Kaltim 2008 23 t PT. Dalima Putra Perdana  PT PLN
             
SUTT 150 Kv Asam Asam Mantuil section 2 Indonensia 2008 332.6 t PT. Dalima Putra Perdana  PT PLN
             
SUBSTATION 150 KV Cikarang Listrindo West Java 2008 13.4 t PT. SIEMENS Indonesia  PT. Cikarang Listrindo Power Company 
             
Substation 170 Kv Kencana Alam  Jawa 2008 6.54 t PT. SIEMENS Indonesia  PT PLN
             
Substation 150 Kv Lolak-Kotamobagu Sulawesi 2008 17.6 t PT. SIEMENS Indonesia  PT PLN 
             
Raised Up Tower Muara Karang Gas Power Plant  Muara Karang 2008 108 t PT. SUMITOMO CORPORATION PT PLN
             
Substation 150 kv Seputih Banyak  Indonesia  2008 107 t PT. SIEMENS Indonesia PT PLN 
             
Tower Transmission SUTT 150 kV Balaraja-New Balaraja Indonesia  2008 327 t PT. Dalima Putra Perdana  PT PLN 
             
Gardu Induk SUTT 150 kV Balaraja - New Balaraja  Indonesia  2008 34 t PT. Dalima Putra Perdana  PT PLN 
             
SUTT 150 kV Patuha - Lagadar  Indonesia  2008         26 t PT. Dalima Putra Perdana  PT PLN 
             
GITET 500 kV New Rawalo (Kesugihan)  Indonesia  2009       775 t PT. Citicon Adhi Nugraha  PT. PLN 
             
150 KV Transmission Line, Celukan Bawang - Kapal  Bali  2009       743 t PT. Multi Fabrindo Gemilang  PT. PLN 
             
SUTT 150 KV Transmission Line, Menes - GI Saketi - GI Rangkas  Banten  2009     1,172 KSO Krakatau Engineering - Wisma Sarana Teknik - Wahayasa Trans Energi - Emsindo Pola Citra  PT. PLN 
             
275 KV Transmission Line, Kiliranjao  - Payakumbuh  Sumbagsel  2009       597 t PT. Dalima Putra Perdana  PT. PLN 
             
275 KV Transmission Line, Kiliranjao  - Payakumbuh  Sumbagsel  2009       452 t PT. Wahanayasa Trans Energi  PT. PLN 
             
Substation 150 KV, Sengkang LNG  Indonesia  2009       159 t SIEMENS Pte, Ltd  PT. PLN 
             
Substation 275kV/150kV Simangkuk  Sumatera  2009       237 t PT. SIEMENS Indonesia  PT. PLN 
             
Gardu Induk Lahendong  Indonesia  2010         12 t PT. ABB Transmission & Distribution PT. PLN 
             
South Sulawesi Karebbe  Hydroelectric Power Project (Gantry) Support Main Bus  South Sulawesi  2010         35 t PT. ABB Transmission & Distribution PT. PLN 
             
150kV Gantry Tanjung Kasam  Batam  2010         42 t PT. Batam Konektra Jaya  PT. PLN 
             
SUTT 150kV Transmission Line, Batam  Batam  2010         36 t PT. Dalima Putra Perdana  PT. PLN 
             
Gantry 150 kV Mliwang  Indonesia  2010         46 t PT. Dalima Putra Perdana  PT. PLN 
             
SUTT 150 kV Sunyaragi - Brebes Indonesia  2010       557 t PT. DaLima Putra Perdana  PT. PLN 
             
Gantry 150 kV Ngimbang  Indonesia  2010         55 t PT. DaLima Putra Perdana  PT. PLN 
             
Substation 500 kV Paiton 3 s/s Project Indonesia  2010         89 t PT. Siemens Indonesia  PT. PLN 
             
150kV T/L for Ulubelu Geothermal Power Plant Project (2x55 MW)  Sumatera  2010       850 t PT. Balfour Beatty Sakti Ind.  PT. PLN
             
T/L 150kV Kalimantan Package C 3 (Project Exection in 2010)  Kalimantan  2010     2,250 t PT. Balfour Beatty Sakti Ind.  PT. PLN
             
T/L 275 kV Galang Binjai OHTL - Medan (Project Execution in 2010)  Medan  2010     1,851 t PT. Balfour Beatty Sakti Ind.  PT. PLN
             
Transmission Line 275 kV Betung Aur Duri  Indonesia  2011       846 t PT. Dalima Putra Perdana  PT. PLN
             
T/L 150 kV Kalimantan Package C3 (Project execution in 2011)  Kalimantan  2011     2,052 t PT. Balfour Beatty Sakti Ind.  PT. PLN 
             
T/L 150 kV - Banyuwangi (T.262 Watudodol)  East Java  2011       106 t PT. Wahayasa Trans Energi  PT. PLN 
             
Gantry 500 kV Ngimbang 2, 150 kV Kediri 2, 150 kV Krian 4, dan 150 kV Grati 2 East Java  2012       110 t PT. Hasta Karya Perdana PT. PLN 
             
150kV GI Cikarang Phase VII Project  Cikarang 2012         58 t PT. Siemens Indonesia PT. Cikarang Listrindo Power Company 
             
Tower 150 kV T/L Wotu - Malili Sec. 2 Indonesia  2012       452 t PT. Menara Indra Utama PT. PLN 
             
GI 150 kV Rengat & Teluk Kuantan (ext) Sumatrera 2012 86.21 t PT. TRUBA Engineering PT. PLN 
             
GI 70 kV Indorama Project Indonesia  2012     22.32 t PT. ABB Sakti Industri PT. PLN